Vendor/Contractor Information
Division 0
- Advertisement
- Instructions to Bidders
- Supplementary Instructions to Bidders
- Proposal
- Proposal (under $50,000)
- Construction Agreement
- General Conditions of the Contract for Construction
- Supplemental General Conditions of the Contract for Construction
Contracts
- Owner, Architect Contractual Agreement
- Owner, Architect Acknowledgement
- Owner, Engineer Contractual Agreement
- Owner, Engineer Acknowledgement
- Owner, Construction Manager Contractual Agreement
- Design/Build Lump Sum Agreement
- Design/Build Construction Manager Agreement
Guidelines
- Design Guidelines (dated 07/01/2009)
- Sprinkler System Guidelines (rev. 1.2 dated 04/24/2007)
- Communications Cabling Guidelines (rev. 0.0 dated 02/12/2009)
- Fire Alarm System Guidelines (rev. 3.6 dated 04/24/2007)
- Pipe Label and Valve Tag Guidelines (dated 01/11/2008)
- RIT CAD Specifications
- How to Open CAD Zip File
- CAD Template Zip

