Boiler Maintenance
New York State regulations require the equipment used to produce hot water and steam that is used to heat, cool, and humidify the campus to be internally inspected annually. To facilitate this inspection, we shut down, cool, drain and open the boilers on campus. We also make necessary tie-ins of new systems, replacements and repairs during this period to limit breakdowns during the times classes are in session.
During these periods, buildings may become hot if the chilled water supply is interrupted by the shut down, or too cold if the building air conditioners are running but the hot water used to temper the air entering the zone is not available. The degree of discomfort will be a function of the weather conditions that occur during the shut down period. Please do not schedule events for the affected buildings during this week.
Consequently, there is nothing that can be done by the operating engineers to alleviate any of the comfort issues that may arise. Please assist us during this busy period by refraining from calling the Operations Center with comfort related calls. We apologize in advance for any less than comfortable conditions that may occur in the affected buildings.
Schedule
The Mark Ellingson Residence Hall boilers will be shut down for yearly maintenance and inspection on Sunday, May 25, 2008 at 4:30PM until Saturday, May 31, 2008 at 11:00PM. Listed in parentheses are the services that will be affected for each of the following buildings.
- 50A - Mark Ellingson Hall (heat, hot water, air-conditioning)
- 50B - Peter Peterson Hall (heat, hot water, air-conditioning)
- 50C - Alexander Graham Bell Hall (heat, hot water, air-conditioning)
- 55 - Hettie L. Shumway Commons (steam, heat, hot water, air-conditioning)
- 60 - Lyndon Baines Johnson Building (heat, hot water, air-conditioning)
The George Eastman Building boilers will be shut down for maintenance and inspection from Saturday, May 24, 2008 at 6:00PM until Sunday, June 1, 2008 at 11:00PM. Listed in parentheses are the services that will be affected for each of the following buildings:
- 01 - George Eastman Building (hot water, A/C, heating, steam)
- 01 - George Eastman Building the Student Financial Services's Offices, rooms 2000, A006 and A025 (A/C)
- 02 - Frank Ritter Ice Arena (hot water, heating)
- 03 - George H. Clark Gymnasium (hot water, heating)
- 04 - Student Alumni Union (hot water, A/C, heating, steam)
- 15 - Campus Connections Bookstore (heating)
The James E. Gleason Building boilers will be shut down for maintenance and inspection from Saturday, May 24, 2008 at 6:00PM until Sunday, June 1, 2008 at 11:00PM. Listed in parentheses are the services that will be affected for each of the following buildings:
- 05 - Wallace Library (hot water, heating)
- 06 - Liberal Arts Building (hot water, heating)
- 07A - James E. Booth Building (hot water, heating, steam, some A/C)
- 07B - Frank E. Gannett Building (hot water, humidity, main A/C, heating)
- 08 - Gosnell Building (hot water, heating, steam)
- 09 - James E. Gleason Building (hot water, heating, steam)
- 17 - Center for Microelectronic and Computer Eng. (heating, steam, scrubber)
The following individual building boiler systems will be shut down for yearly maintenance and repairs Saturday, May 24, 2008 at 6:00PM until Sunday, June 1, 2008 at 11:00PM. Listed in Parentheses are the services that will be affected for each of the following buildings:
- 10 - Ross Building (heat)
- 12 - Max Lowenthal Building (heat)
- 13 - Gosnell Anex (heat)
- 14 - Hugh L. Carey Building (heat)
- 16 - Schmitt Interfaith Chapel (heat)
- 23 - Hale-Andrews Student Life Center (heat)
- 24 - Field House (heat)
- 25 - Grace Watson Dining Hall (steam, hot water, heat)
- 27 - Francis Baker Hall (heat)
- 28 - Greek Housing (hot water, heat)
- 29 - Francis Baker Hall (heat)
- 30 - Greek Housing (hot water, heat)
- 31 - Eugene Colby Hall (heat)
- 32 - Greek Housing (hot water, heat)
- 33 - Eugene Colby Hall (heat)
- 35 - Kate Gleason Hall (heat)
- 37 - Eugene Colby Hall (heat)
- 39 - Helen Fish Hall (heat)
- 41 - Helen Fish Hall (heat)
- 43 - Nathaniel Rochester Hall (heat)
- 47 - Sol Heumann Hall (heat)
- 49 - Carlton Gibson Hall (heat)
- 70 - CAST (heat)
- 76 - Chester F. Carlson Center for Imaging Science (heat)
- 77 - Bausch & Lomb Center (heat)
- 78 - Center for Integrated Manufacturing Studies (heat)
- 86 - IT Building (heat)
- 89 - Crossroads Building (heat)